• Greener Projects
  • Jobs
  • About us
    • How it all started
    • Jobs
    • Environment
    • Frequently Asked Questions
  • News
  • Newsletter
  • Blog
  • ENEN
    • NLNL
    • ENEN
Greener
  • Services
    • Shore power
    • Zero Emission Construction Site
    • Grid Services
    • Clean Energy for Events
    • Mobile EV Charging
  • Batteries
  • Technology
  • Recent Projects
  • Contact
  • Request a quote
  • Search
  • Menu Menu

Zero Emission Construction Site

Our reliable and clean energy supply on your construction site saves up to 100% on your diesel consumption and on your CO2 and nitrogen emissions. In addition, we deliver our batteries quickly, so you do not have to wait for a delayed construction connection. Working with Greener can also increase the likelihood to win tenders, especially for construction projects that are near vulnerable nature and in busy cities. On to the zero emission construction site!

  • Reduce CO2 emissions
  • Reduce costs
  • Improve working conditions
  • Improve energy up-time
  • Win tenders

100%

Reduction CO2 emission on site

80%

Less diesel engine running hours

60%

Savings on fuel

Our Services for

Fast charging electrical equipment

Electric-diggers, -excavators, and -wheel loaders are already a reality. And many municipalities are now demanding the use of such electric equipment and forbidding the use of diesel generators.

Charging these machines with our batteries considerably reduces charging times and greatly improves efficiency.

  • Fast charging of electric machinery

Peak power on construction sites

Extended waiting time for a sufficient grid connection for power cranes, lifts, welding-, and thermal-equipment can extend planning by months.

By using batteries, existing smaller grid connections can become valuable energy assets because these batteries deliver peak power while being charged by the grid. This results in zero emission construction sites.

  •  Peak Power without CO2 emissions

Less emission from infrastructural projects

Our battery can deliver the peaks required in the infrastructure sector with ease. When there is no clean power source on site, batteries can be swapped or charged at a small generator. Placing our batteries on a trailer ensures a flexible usage. This is ideal for projects close to a Natura 2000 area.

  • Flexible solutions with less or no emissions

Technical Specifications

Fast deployment

Our batteries are easy to set up. After arriving on site they can be running within minutes.

24/7 monitored & operated

The monitoring and operation of our batteries is done remotely, which gives maximum comfort.

Simple integration

Integration with other energy assets like solar panels, grid connections or diesel generators is no problem.

Off grid deployment

You need a hybrid set-up when there is no grid connection and when 336 kWh is insufficient. Our system controls the diesel generator, resulting in 80% less diesel running hours and 60% fuel savings.

318 kVA power

When our batteries act as a stand-alone power source, they provide 318 kVA and 336 kWh of clean energy.

Peak Shaving

For high capacity power projects peak shaving on existing grid connections with our batteries is possible: the base electric capacity comes from the grid, and our batteries deliver the power peaks.

Recent Projects

Peak Shaving for Stud Welding

Welding equipment, cranes, lifts and offices can be powered by batteries in combination with small grid connections. For most construction sites we find that an 80 amp grid connection with a battery is enough. This makes waiting for and investing in 400 or 630 KVA grid connections obsolete. Our batteries can also power operations that require short but high peaks of energy use, such as stud welding. In such cases our batteries can allow for peaks of 230 amps, in combination with only an 80 amp grid connection.

Sheet Piling for Gebr. De Koning

A considerable amount of power is required to install sheet piling. Greener provided Gebr. De Koning with a battery to supply these powers, so they did not need any diesel. This resulted in fast sheet piling for the new residential area Weespersluis, using 100% green energy.

The battery was placed on a trailer, so the transport together with the installation is easy. The battery effortlessly provided the peaks needed to place the sheet piles. At the end of the construction day, the team returned the battery to the 3x63a grid connection 100 meters away. At night the sustainable electricity at night was charging the battery. This way the construction team could get back to work the next day with a fully charged battery on their zero-emission construction site.

Working with Greener for sheet piling exceeded our expectations. Our machines functioned really well on the energy from the battery, there was plenty of power left before the work was done!

Martijn de KoningGebr. De Koning

Power supply is very important to us. We would like to supply a complete product for our client, but the amount of power that is needed always remains a challenge because welding 25mm pin dowels uses much more power than the rest of the construction site.

Peter de WitteManager Operations at Köco / KSM Holland

In our temporary housing situation, Greener’s batteries could compete well with only diesel generators. After several weeks of deployment, Greener’s deployment was even cheaper.

Daan LeentvaarProject Manager at Kafra Housing

There was a power outage, the whole neighborhood was dark. Fortunately, Greener’s battery took over. Wonderful to experience that the light always stays on with us. Even in the event of a power failure.

Kaj UhlOrganizer East Nomads
PreviousNext

Need a Mobile Power Solution?

Start saving diesel and costs using Mobile Batteries

View Batteries Contact us

Services

Shore power

Carbon-Free Construction Sites

Green Energy for Events

Mobile EV Charging

Grid Services

Recent projects

More about us

Our batteries

Technology

Environment

Jobs

Frequently Asked Questions

Newsletter: Power update

Receive our product updates, projects, news and job offers four times a year.



Contact

info@greener.nl
+31 20 244 0100

More contact info

LinkedIn

| Eco-friendly webhosting by GreenGeeks | Website development: Green Marketers | Terms and Conditions | Privacy | © Copyright - Greener
Scroll to top