Carbon-Free Construction Sites

Reliable and clean energy supply on your construction site is crucial in order to meet your client’s expectations. Using mobile battery storage for your construction project can save up to 100% CO2 emissions, reduce costs, win tenders and improve working conditions and energy up-time.

  • Reduce CO2 emissions
  • Reduce costs
  • Improve working conditions
  • Improve energy up-time
  • Win tenders
100%

Reduction CO2 emission on site

80%

Less diesel engine running hours

60%

Savings on fuel

Our Services are used for

High Power Charging

Electric-diggers, -excavators, and -wheel loaders are already a reality. And many municipalities are now demanding the use of such electric equipment and forbidding the use of diesel generators.

Charging these machines with our batteries considerably reduces charging times and greatly improves efficiency.

  • Fast charging of electric machinery

Heavy Power Use

Extended waiting time for a sufficient grid connection for power cranes, lifts, welding-, and thermal-equipment can extend planning by months.

By using batteries, existing smaller grid connections can become valuable energy assets because these batteries deliver peak power while being charged by the grid. This can results in 100% CO2 free power delivery.

  •  Peak Power without CO2 emissions
Electric Vehicle Charging

Electric Vehicle Charging

Generally, everybody who arrives on site in electric vehicles needs to charge. With the help of Greener they can be fully charged by the end of the working day.

  • Charge EV’s with 100% renewable energy

Technical Specifications

Fast deployment

Our batteries are easy to set up. After arriving on site they can be running within minutes.

24/7 monitored & operated

The batteries are remotely monitored and operated, giving maximum comfort.

Simple integration

Integration with other energy assets like solar panels, grid connections or diesel generators is no problem.

Off grid deployment

You need a hybrid set-up when there is no grid connection and when 336 kWh is insufficient. Our system controls the diesel generator, resulting in 80% less diesel running hours and 60% fuel savings.

318 kVA power

When our batteries are used as a stand-alone power source, they provide 318 kVA and 336 kWh of clean energy.

Peak Shaving

For high capacity power projects our batteries can be used for peak shaving on existing grid connections: the base electric capacity comes from the grid, and our batteries deliver the power peaks.

Recent Projects

Peak Shaving for Stud Welding

Welding equipment, cranes, lifts and offices can be powered by batteries in combination with small grid connections. For most construction sites we find that an 80 amp grid connection with a battery is enough. This makes waiting for and investing in 400 or 630 KVA grid connections obsolete. Our batteries can also be used for operations that requires short but high peaks of energy use, such as stud welding. In such cases our batteries can allow for peaks of 230 amps, in combination with only an 80 amp grid connection.

Batteries for delayed Grid Connection

Getting a new grid connection can be a lengthy process. Diesel generators are often used to provide temporary power. But they are usually not used efficiently, and they provide only a limited insight in energy consumption. This means unnecessary CO2 emissions, local air pollution, and money wasted.  We can solve this problem. In a recent project, for example, a holiday park using Greener batteries saved 120 liters of diesel per hour during a period of ten weeks. And we provided daily updates on fuel and energy consumption.

Power supply is very important to us. We would like to supply a complete product for our client, but the amount of power that is needed always remains a challenge because welding 25mm pin dowels uses much more power than the rest of the construction site.

Peter de WitteManager Operations at Köco / KSM Holland

In our temporary housing situation, Greener’s batteries could compete well with only diesel generators. After several weeks of deployment, Greener’s deployment was even cheaper.

Daan LeentvaarProject Manager at Kafra Housing

There was a power outage, the whole neighborhood was dark. Fortunately, Greener’s battery took over. Wonderful to experience that the light always stays on with us. Even in the event of a power failure.

Kaj UhlOrganizer East Nomads
PreviousNext

Need a Mobile Power Solution?

Start saving diesel and costs using Mobile Batteries

View Batteries Contact us

Services

Carbon-Free Construction Sites

Green Energy for Events

Mobile EV Charging

Grid Services

Recent projects

More about us

Our batteries

Technology

Environment

Jobs

Frequently Asked Questions

Newsletter: Power update

Receive our product updates, projects, news and job offers four times a year.



Contact

info@greener.nl
+31 20 244 0100

More contact info

LinkedIn

| Eco-friendly webhosting by GreenGeeks | Website development: Green Marketers | Privacy | © Copyright - Greener
Scroll to top